timeline

<!– HORIZONTAL TIMELINE — paste this whole block into a WordPress "Custom HTML" block (Gutenberg: + → Custom HTML, or a Text widget in Classic/Elementor Text editor if HTML is allowed) HOW TO EDIT: – Each event lives inside a
block below. – Change the date, title, and description text directly. – Copy/paste a whole .tl-event block to add more stops; delete one to remove a stop. – Change –tl-accent below to any hex color to reskin the whole thing in one place. –>
.tl-wrap { –tl-accent: #0077c8; –tl-ink: #0077c8; –tl-paper: #ffffff; –tl-line: #ff6d00; –tl-font-display: Roboto, sans-serif; –tl-font-body: Roboto, sans-serif; background: var(–tl-paper); color: var(–tl-ink); padding: 48px 0 40px; font-family: var(–tl-font-body); box-sizing: border-box; } .tl-wrap *, .tl-wrap *::before, .tl-wrap *::after { box-sizing: inherit; } .tl-track { position: relative; overflow-x: auto; scroll-snap-type: x proximity; padding: 12px 40px 28px; scrollbar-width: thin; scrollbar-color: var(–tl-accent) transparent; } .tl-track::-webkit-scrollbar { height: 6px; } .tl-track::-webkit-scrollbar-thumb { background: var(–tl-accent); border-radius: 3px; } .tl-inner { position: relative; display: inline-flex; gap: 64px; } .tl-inner::before { content: “”; position: absolute; left: 0; right: 0; top: 60px; height: 2px; background: var(–tl-line); z-index: 0; } .tl-event { position: relative; flex: 0 0 220px; scroll-snap-align: start; z-index: 1; } .tl-date { font-family: var(–tl-font-display); font-size: 1.75rem; font-weight: 700; letter-spacing: 0.02em; margin-bottom: 20px; } .tl-dot { width: 14px; height: 14px; border-radius: 50%; background: var(–tl-paper); border: 2px solid var(–tl-accent); margin-bottom: 12px; transition: transform 0.15s ease, background 0.15s ease; } .tl-event:hover .tl-dot { background: var(–tl-accent); transform: scale(1.15); } .tl-title { font-family: var(–tl-font-display); font-size: 1.15rem; line-height: 1.3; margin: 0 0 6px; } .tl-desc { font-size: 0.92rem; line-height: 1.5; color: #000000; margin: 0; } .tl-nav { display: flex; justify-content: flex-end; gap: 8px; padding: 0 40px; margin-bottom: 4px; } .tl-nav button { width: 34px; height: 34px; border-radius: 50%; border: 1px solid var(–tl-line); background: var(–tl-paper); color: var(–tl-ink); cursor: pointer; font-size: 1rem; line-height: 1; transition: background 0.15s ease, border-color 0.15s ease; } .tl-nav button:hover { background: var(–tl-accent); border-color: var(–tl-accent); color: #fff; } @media (max-width: 640px) { .tl-inner { gap: 40px; } .tl-track { padding-left: 20px; padding-right: 20px; } .tl-event { flex-basis: 180px; } .tl-nav { padding: 0 20px; } }
1999

Prepare

Lt. Governor Jodi Rell is asked to make recommendations to ensure that CT’s schools and libraries are prepared to meet the computer and information technology needs of the 21st Century.

2000

Established

Public Act 00-187 establishes the Connecticut Education Network under the auspices of a new Connecticut Commission for Education Technology.

2001

Connects

CEN connects first school district (Bristol Public Schools) with a 155Mbps OC-3, replacing its 1.544 Mbps T1 circuit.

2002

Endorses

CET endorses the CEN Architecture Policies; State signs a master agreement allowing a private company to build fiber supporting CEN connections through the state.

2003

Sponsor

August 25: UConn and Yale sponsor CEN members for Internet2 connectivity through SEGP (Sponsored Education Group Program).

2004

Go-live

December: Governor Rell enables ‘go-live’ of the CEN members connecting to NEREN.

2005

K-12 Districts

All K-12 districts connected to CEN, enabling new teaching and learning opportunities statewide for CT’s next generation educated workforce. First in the country!

2006

Funding Boost

Gov. Rell announces funding boost to continue linking schools to CEN within districts and aggregate traffic tops 1Gbps.

2008

Savings

K-12 districts report an average of $20,000/year savings by connecting to CEN; All CT State Universities, System Offices, and Community Colleges connected via fiber.

2009

BTOP Block Grant

Co-awarded federal Broadband Technologies Opportunity Program (BTOP) block grant. $35M (of $90M) to CEN with new ‘open access’ provisions allowing municipal and state government, public safety, healthcare, ‘any’ member groups to join for a fair price.

2010

Backbone Capacity

Backbone capacity increased tenfold through BTOP upgrade and expansion.

2011

Ethernet

Completed K-12 district upgrades enabling gigabit Ethernet connections in every district.

2012

Annual Conference

CEN welcomed a new director. Annual conference started, providing a forum for collaboration, innovation, and community best practice. Approximately 300 in attendance.

2013

Municipalities

CT PA 13-247 grant fund for municipalities and regional councils of governments (RCOG) to connect. Resulting in over 100 municipalities connecting over time.

2014

NSF Grant

Via NSF grant, completed a science DMZ; established 100 Gig research corridor between UConn Storrs and UConn Health in Farmington.

2015

Saves Millions

Completed 100 Gbps connection to Internet2, becomes R&E ‘regional connector;’ DDoS service starts at no additional cost to members, mitigates 245 attacks in the first year, saving millions in productivity for the state.

2016

Libraries

Awarded 1st CT Library Fiber Consortia bid, begin connecting additional libraries with high-speed fiber; State appropriation to wind down to $0 by 2019; become an E-Rate service provider.

2017

Advisory Councils

CEN welcomed a new director, re-established advisory councils, receives $1.5M bond for equipment.

2018

Network Capacity

Upgrades network core capacity to 200 Gbps. Aggregate peak traffic tops 100 Gbps. State appropriation swept for cost-cutting, in-year operational self-sustainment comes 1 year early. Cost avoidance to the state due to the existence of CEN calculated up to $29M annually.

2019

Into the Future

New strategic plan released!